MBPG 入伙纸 简介
-
CFO(Certificate of Fitness for Occupation)或CCC(Certificate of Completion and Compliance)是巴西古当市政厅(MBPG)签发的法律文件,证明建筑在完工后安全且适合居住或使用,符合当地建筑规范及法规要求。
相关政府部门
- 巴西古当市政厅(Majlis Bandaraya Pasir Gudang,MBPG)
执照名称(马来文)
- Sijil Layak Menduduki (CFO) / Sijil Siap dan Pematuhan (CCC)
详细信息
- CFO或CCC证明建筑已根据批准的设计建造,并符合安全、结构及使用标准。
- 适用于MBPG辖区内的新建工程、重大装修或扩建项目。
- CCC由认证专业人士(建筑师/工程师)签发,而CFO由MBPG批准发放。
- 必要检查包括结构、水管、电气及消防安全合规性。
重要规则
- 未取得CFO或CCC,禁止占用或使用建筑物。
- 建筑施工必须遵守所有已批准的设计、材料及安全标准。
- 对建筑设计的任何更改必须事先获得MBPG批准。
- 所有相关费用及税款必须在CFO/CCC发放前缴清。
违规与惩罚
- 未持有效CFO或CCC占用建筑物可能导致: RM 1,000至RM 50,000的罚款。
- 不遵守MBPG建筑规范或法规可能导致: 法律诉讼或拆除令。
- 额外处罚可能包括暂停进一步施工活动及移除未经授权的结构,费用由业主承担。
顾问
许可证顾问 - Ms. Mira
Ms. Mira, 是您的专属许可顾问,专业提供以下服务: 业务许可证和执照申请指导 审批流程咨询与支持 确保符合所有相关法规要求 通过 Ms. Mira 的专业服务,轻松完成您的执照申请流程,让复杂的事务变得简单快捷! 立即与 Ms. Mira 联系,简化您的许可流程!
Commonly Asked Questions
All property owners constructing new buildings, major extensions, or significant renovations within MBPG’s jurisdiction.
It certifies that the building is safe, structurally sound, compliant with MBPG regulations, and legally fit for occupancy.
- CCC (Certificate of Completion and Compliance): Issued by a certified architect or engineer to confirm compliance with approved plans.
- CFO (Certificate of Fitness for Occupation): Issued by MBPG after verifying all safety, structural, and regulatory requirements.
You may only occupy the building after the CFO or CCC has been officially issued. Occupying earlier is illegal and may result in fines or enforcement action.
- Structural integrity
- Plumbing and electrical systems
- Fire safety compliance
- Verification against approved plans
- Approved building plans and as-built drawings
- BOMBA approval
- Utility clearances (TNB, SAJ, IWK)
- Safety and compliance reports
- Photographic evidence of completion
It depends on project complexity and documentation, typically ranging from 30 to 90 working days.
Any modifications must be submitted to MBPG for approval. Unauthorized changes can delay CFO/CCC issuance and may lead to fines or enforcement action.
Fees vary based on building type, size, and inspections required. All payments must be made before issuance.
- Fines ranging from RM1,000 to RM50,000
- Stop-work orders for ongoing construction
- Demolition of unauthorized structures at the owner’s expense
-
Legal action by MBPG